Edellinen Seuraava
Myyntipäivä
10.9.2019
# tarjouksista
21
TUOTTEEN TIEDOT
Mittarilukema
0 Mailit


See Spec Sheet & MTR's attached below Documentation.

Loadout Charges:
$250.00/Truck if pipe is to be loaded nested. If the pipe is to be stripped loaded there will be an additional charge of $100/Truck. Trucks are to supply dunnage.

Hours of Operation:
Loadout must be scheduled 24-hours in advance between 7am - 2pm, Monday thru Friday. If truck arrive after 2 they will be loaded the following day. There will be no loading after 3pm. If any empty trucks remain after 3pm they will be loaded the following day.

Trucks will be loaded on a first come first serve basis.

If you have any questions or would like to inspect please contact:
David Fondren
dfondren@rbauction.com
(832) 702-4395



Tarkastusraportti



Huomaa, että teet tarjouksen tuotteelle, jolla ei ole IronClad Assurance® -vakuutusta. Saat vain perustiedot tuotteesta ja sen kunnosta ostopäätöksesi vahvistamista varten.

Tämä tuote tarjotaan myyntikunnossa ilman IronClad Assurance -vakuutusta, eikä ostaja voi reklamoida tuotteen kunnosta. IronPlanetilla ei ole vastuuta tämän tuotteen kunnosta tai kuvauksesta. Tällä tuotteella ei ole IronClad-vakuutuksen tarjoamaa suojaa. Ostaja EI voi jättää reklamaatiopyyntöä tästä tuotteesta.


Lisäkuvat
(7)
 
EI VALITUSOIKEUTTA